Column Control DTX

Water Meter Manufacturer Reduces Development Cycle by Two Months

案例研究

Using the X8712A IoT Device Battery Life Optimization Solution, one large water meter manufacturer in China was able to shave two months off their development and test time, and improved their design, extending battery life to over 10 years. This case study explained how the manufacturer was able to achieve their design excellence.

×

請銷售人員與我聯絡。

*Indicates required field

您希望以何種方式取得相關資訊? *必填欄位
Preferred method of communication? 變更email?
Preferred method of communication?

請點擊按鈕後,提供給是德科技您的個人資料。您可以從 Keysight隱私聲明 中,閱讀到我們如何使用這些資料的訊息,謝謝。

感謝您!

A sales representative will contact you soon.

Column Control DTX